Projects Equipments

 

 

Dissolved Alumina Piping Project of China Aluminum Corporation Henan Branch-one of the key projects of the national 8th 5-year-plan.
With the technology introduced from Germany, the Byre plant produces 180,000 tons of alumina per year. The project won a ministerial top priz

 

1850T/D Gaseous Suspension Baking Furnace Project, which won a ministerial top prize. The facility is designed with a view to the output increase thereafter. A rarely high production rate of 2250T/D is attainable after a toilless reconstruction.

 

Flat Tray Filtration Project of Alumina Production of CHALCO Henan Branch. The construction is undertaken in 1993 and also won a ministerial top prize. It is used for the decomposition & washing of Al (OH)3 and to provide material for the 1850T/D Gaseous Suspension Baking Furnace. The technology and equipments adopted in the project is advanced in china and even in the world.

 

Seed Precipitation Facilities of the Alumina Plant of CHALCO Henan Branch. It is a large-scale project including the fabrication and installation of 7 seed decomposition tanks with a total weight of 1940t. The project, which was contracted in early 2004, was completed successfully In June that year through the persistent effort of the whole staff.

 
The City Swimming Natatorium, a first-class indoor natatorium of the province. The building, which is 15 meters high, 73 meters long and 60 meters wide, was designed with 2 layers of framework and radiant heating system. In the natatorium, there is a standard swimming pool, a practicing pool and a miniature for children.
  The demonstration project is one of the key constructions to increase the Alumina output. 80,000,000 RMB was invested in the construction of the tanks. The work could be divided into 6 parts i.e. deposition tanks, decomposition tanks, high-efficient deposition tanks, flocculent preparation and the construction of pump room and conduits. The tanks are all hydraulic-powered mechanical mixing tanks.
 
Fxxiang Aluminum Project, in which 200,000,000 Yuan was invested, included 2 500m-meter-long workshops and 136 sets of electrolyzing pots. Through bidding, China Great Wall Aluminum Construction Corporation takes on the work of 68 sets of pots and one of the workshops. Each pot weighs 25t and the dimension is 11.5*4.97*1.9. The corporation struggled and overcame the unexpected problem of excessive groundwork due to the poor site ground condition. The construction was completed 4 days before the schedule and the quality was much better than the other 3 rival contractors.
  Electrolyzing pots imported to Iceland. The corporation is a dominant producer of electrolytic aluminum production facilities. In 2004, the corporation was chose by Nordual, the corporation from Iceland as the supplier of electrolyzing pots and superstructures. In order to fulfill the contract in time, a workshop was built and put into use. Up to now, the first batch of facilities has passed the inspection and was shipped from Lianyungang.
   
Hyperbolic Cooling Towers of the Circulating Water project of CACHB, 36m in diameter and 45m in length. The project occupied an area of 3000m2. The dimensions of pools for cold and hot water are 40*25*7m3 and 50*48*8m3. In all, 800 tons of conduits were installed in the towers and over 2000m3 concrete was applied.
   
TEL:0371-68923623   FAX:0371-68115413
ADD:Shangjie District,Zhengzhou,Henan,China POST:450041
E-mail :cljs@ecljs.com
http://www.ecljs.com